ZLA Logo
Who's Online
Online Controllers

No controllers online

Flights to/from ZLA

Departures (5)

Callsign Dep Arr Status ETA
CPA225 KLAX VHHH Enroute 1620
GEC8407 KLAX ZSPD Enroute 1849
ACA780 KLAX CYUL Enroute 1219
VIR8Y KLAX EGLL Enroute 1009
GXL14E KLAX KJAC Enroute 1949

Arrivals (13)

Callsign Dep Arr Status ETA
DLH452 EDDM KLAX Enroute 1909
CAL8 RCTP KLAX Enroute 1914
SIA12 RJAA KLAX Enroute 1847
VIR983 EGLL KLAX Enroute 0125
GTI8205 EGSS KLAX Enroute 0030
BAW78 EGLL KLAX Enroute 0026
RPV1100 KIAH KLAX Enroute 1914
AAL72 YSSY KLAX Enroute 1746
AFR22J LFPG KLAX Enroute 0310
BAW283 EGLL KLAX Enroute 0710
QFA93 YMML KLAX Departing
FDX3951 KEWR KLAX Enroute 2342
BAW269 EGLL KLAX Departing

Los Angeles (SoCal) 18

Arrivals (2)

Callsign Dep Arr Status ETA
DLH46R EDDM KSAN Enroute 0607
JAL66 RJTT KSAN Enroute 1302

San Diego (SoCal) 2

Departures (1)

Callsign Dep Arr Status ETA
N604FS KVNY PHLI Enroute 2120

Burbank (SoCal) 1

Departures (1)

Callsign Dep Arr Status ETA
FFT3889 KPSP KDEN Enroute 1600

Palm Springs (SoCal) 1

Departures (1)

Callsign Dep Arr Status ETA
NDF4567 KLAS EDDH Enroute 1726

Arrivals (1)

Callsign Dep Arr Status ETA
VIR1HB EGCC KLAS Enroute 0124

Las Vegas 2
  • Flights To/From ZLA: 24
  • Flights in ZLA Airspace: 6
  • Controller Schedule

    October 5th, 2026

    No sessions found for selected date

    Bakersfield Approach (BFL)

    DATE VERSION CONTACT
    2024-06-19 3.50 Facility Advisory Board
    1. PURPOSE.
    This Standard Operating Procedure (SOP) outlines the procedures to be used by controllers working Bakersfield Approach to ensure that arrival flows are handled in as efficient and timely a manner as possible.

    2. ROLES AND RESPONSIBILITIES.
    The Office of Primary Responsibility (OPR) for this SOP is the ZLA Senior Staff. This SOP was signed and approved by Andrew Cleeremans, ZLA Chief Instructor, and ZLA Facility Chief Marc Sykes on December 30, 2003. This SOP shall be maintained, revised, updated or cancelled by the ZLA Staff or any other organization that supercedes, replaces or assumes the Staff responsibilities. Any suggestions for modification or amendment to this SOP should be sent to the ZLA Staff for review.

    3. DISTRIBUTION.
    This SOP is intended for use by controllers staffing Bakersfield Approach (BFL)

    4. BACKGROUND.
    This SOP will be the primary outline of Bakersfield Approach procedures

    5. REQUIREMENTS.
    1. Frequencies
      1. Bakersfield Approach 118.80
      2. Bakersfield Tower 118.10
      3. Bakersfield Ground 121.70
    2. Airspace
      1. Approach owns the airspace as shown on the TRACON graphic from SFC-13000’
    3. Special Instructions
      1. KBFL Runway use program
        1. Normal operations use runways 30L/R
        2. East operations use runways 12L/R when the wind is out of the northeast at greater than 10kts
      2. KBFL Arrivals
        1. FASTO STAR arrivals are received from ZLA 27 descending to 13000’. This arrival is designed to feed the ILS 30R but may be used when aircraft must circle to runway 12L/R
        2. Arrivals from ZOA will be received descending to 10000’
      3. KBFL Departures
        1. Initial climb in Approach airspace is 3000’
        2. MARIC, WRING SID departures are pilot navigated
        3. MEADOWS SID departures must be vectored on course