ZLA Logo
Who's Online
Online Controllers Flights to/from ZLA

Departures (8)

Callsign Dep Arr Status ETA
QFA85 KLAX YSCB Enroute 1301
QTR33Q KLAX OTHH Enroute 1748
UAL440 KLAX KORD Enroute 1036
MUC1115 KLAX EDDM Enroute 1818
UAL801 KLAX VHHH Enroute 2040
UAL433 KLAX KSAN Enroute 1600
ASA871 KLAX KSFO Enroute 1814
BAW4Q KLAX EGLL Enroute 0402

Arrivals (12)

Callsign Dep Arr Status ETA
UAE14E OMDB KLAX Enroute 0034
QTR912 OTHH KLAX Enroute 0101
KAL207 RKSI KLAX Enroute 1723
TAM8086 SBGR KLAX Enroute 1451
QFA11 YSSY KLAX Enroute 1517
SVA41 OERK KLAX Enroute 1957
LX223 LSZH KLAX Enroute 0048
LOT21 EPWA KLAX Enroute 0102
DLH62H EDDM KLAX Departing
QFA55 YBBN KLAX Departing
DLH452 EDDM KLAX Departing
KAL17 RKSI KLAX Departing

Los Angeles (SoCal) 20

Departures (1)

Callsign Dep Arr Status ETA
UPS1107 KONT KPHX Enroute 1751

Empire (SoCal) 1

Departures (5)

Callsign Dep Arr Status ETA
UAL2270 KSAN KDEN Enroute 1600
FFT3219 KSAN KDFW Enroute 0834
AMX128 KSAN KSFO Enroute 1549
N540PB KSAN Enroute 1600
N5544Z KSAN Enroute 1359

Arrivals (2)

Callsign Dep Arr Status ETA
UAL433 KLAX KSAN Enroute 1600
SKW3347 KPHX KSAN Enroute 1727

San Diego (SoCal) 7

Arrivals (1)

Callsign Dep Arr Status ETA
N595BB KFAT KPSP Enroute 0054

Palm Springs (SoCal) 1

Arrivals (1)

Callsign Dep Arr Status ETA
FDX1MK KDEN KLAS Enroute 0312

Las Vegas 1
  • Flights To/From ZLA: 30
  • Flights in ZLA Airspace: 10
  • Controller Schedule

    November 10th, 2025

    No sessions found for selected date

    Point Mugu Approach (NTD)

    DATE VERSION CONTACT
    2025-05-13 3.20 Facility Advisory Board
    1. PURPOSE.
    This Standard Operating Procedure (SOP) outlines the procedures to be used by controllers working Point Mugu Approach to ensure that arrival flows are handled in as efficient and timely a manner as possible.

    2. ROLES AND RESPONSIBILITIES.
    The Office of Primary Responsibility (OPR) for this SOP is the ZLA Senior Staff. This SOP was approved by the Staff on January 1, 2003. This SOP shall be maintained, revised, updated or canceled by the ZLA Senior Staff and Facility Engineering Team. Any suggestions for modification or amendment to this SOP should be sent to the OPR for review.

    3. DISTRIBUTION.
    This SOP is intended for use by controllers staffing Point Mugu Approach (NTD_APP)

    4. BACKGROUND.
    This SOP will be the primary outline of Point Mugu Approach procedures

    5. REQUIREMENTS.
    1. Frequencies
      1. Point Mugu Approach 124.70
      2. Point Mugu Tower 124.85
      3. Point Mugu Ground 121.60
      4. Point Mugu Clearance Delivery 120.75
      5. All other positions within the Point Mugu RAPCON will use frequencies prescribed in the Minor Airport Reference Sheet.
    2. Airspace
      1. Point Mugu Approach owns the airspace as depicted on the video map from SFC-8000, excluding the area known as Plead Control unless otherwise coordinated. 
    3. Special Instructions
      1. KCMA/KOXR Arrivals will be received from the SOCAL Burbank Area established on the final approach course and cleared for the approach. These aircraft must be monitored and handled if they go missed