ZLA Logo
Who's Online
Online Controllers

No controllers online

Flights to/from ZLA

Departures (9)

Callsign Dep Arr Status ETA
SJX1 KLAX RCTP Enroute 1031
ANZ3 KLAX NZAA Enroute 1342
CPA885 KLAX VHHH Enroute 1644
ANZ5 KLAX NZAA Enroute 1455
AFR26 KLAX NTAA Enroute 1154
LOT22 KLAX EPWA Enroute 1629
THY10 KLAX LTFM Enroute 1508
BAW8DS KLAX EGLL Arriving
KLM602 KLAX EHAM Enroute 1600

Arrivals (10)

Callsign Dep Arr Status ETA
DLH822 EDDM KLAX Enroute 2030
AFL106 UUEE KLAX Enroute 1826
SVA041 OEJN KLAX Enroute 0259
SVA041D OEJN KLAX Enroute 0325
QFA7341 YSSY KLAX Enroute 1535
PTI737 EGLL KLAX Enroute 0104
VIR7 EGLL KLAX Enroute 1306
VIR92Q EGCC KLAX Departing
VIR7B EGLL KLAX Enroute 0457
QTR221 EGKK KLAX Departing

Los Angeles (SoCal) 19

Departures (1)

Callsign Dep Arr Status ETA
CAL23 KONT RCTP Enroute 2015

Empire (SoCal) 1

Departures (2)

Callsign Dep Arr Status ETA
BAW9SW KSAN EGLL Enroute 1042
AEE501 KSAN KMEM Arriving

Arrivals (1)

Callsign Dep Arr Status ETA
BAW273 EGLL KSAN Enroute 0111

San Diego (SoCal) 3

Departures (1)

Callsign Dep Arr Status ETA
BAW4LV KLAS EGLL Enroute 1435

Arrivals (1)

Callsign Dep Arr Status ETA
BAW2MW EGLL KLAS Enroute 2228

Las Vegas 2
  • Flights To/From ZLA: 25
  • Flights in ZLA Airspace: 2
  • Controller Schedule

    April 17th, 2026

    No sessions found for selected date

    Bakersfield Approach (BFL)

    DATE VERSION CONTACT
    2024-06-19 3.50 Facility Advisory Board
    1. PURPOSE.
    This Standard Operating Procedure (SOP) outlines the procedures to be used by controllers working Bakersfield Approach to ensure that arrival flows are handled in as efficient and timely a manner as possible.

    2. ROLES AND RESPONSIBILITIES.
    The Office of Primary Responsibility (OPR) for this SOP is the ZLA Senior Staff. This SOP was signed and approved by Andrew Cleeremans, ZLA Chief Instructor, and ZLA Facility Chief Marc Sykes on December 30, 2003. This SOP shall be maintained, revised, updated or cancelled by the ZLA Staff or any other organization that supercedes, replaces or assumes the Staff responsibilities. Any suggestions for modification or amendment to this SOP should be sent to the ZLA Staff for review.

    3. DISTRIBUTION.
    This SOP is intended for use by controllers staffing Bakersfield Approach (BFL)

    4. BACKGROUND.
    This SOP will be the primary outline of Bakersfield Approach procedures

    5. REQUIREMENTS.
    1. Frequencies
      1. Bakersfield Approach 118.80
      2. Bakersfield Tower 118.10
      3. Bakersfield Ground 121.70
    2. Airspace
      1. Approach owns the airspace as shown on the TRACON graphic from SFC-13000’
    3. Special Instructions
      1. KBFL Runway use program
        1. Normal operations use runways 30L/R
        2. East operations use runways 12L/R when the wind is out of the northeast at greater than 10kts
      2. KBFL Arrivals
        1. FASTO STAR arrivals are received from ZLA 27 descending to 13000’. This arrival is designed to feed the ILS 30R but may be used when aircraft must circle to runway 12L/R
        2. Arrivals from ZOA will be received descending to 10000’
      3. KBFL Departures
        1. Initial climb in Approach airspace is 3000’
        2. MARIC, WRING SID departures are pilot navigated
        3. MEADOWS SID departures must be vectored on course