ZLA Logo
Who's Online
Online Controllers

No controllers online

Flights to/from ZLA

Departures (9)

Callsign Dep Arr Status ETA
KLM602 KLAX EHAM Enroute 1713
ABR105 KLAX EINN Enroute 1630
AMX301R KLAX ZSPD Enroute 1021
DAL1714 KLAX KSEA Enroute 2339
DAL1551 KLAX KSEA Enroute 2306
DLH453 KLAX EDDM Enroute 1921
BAW8DS KLAX EGLL Enroute 0930
DLH453J KLAX EDDM Enroute 1155
DLH453A KLAX EDDM Enroute 0942

Arrivals (11)

Callsign Dep Arr Status ETA
FIN1 EFHK KLAX Enroute 1945
QFA11 YSSY KLAX Enroute 1653
KLM9 YSSY KLAX Enroute 1713
GEC8420 EDDF KLAX Enroute 0103
QTR739 OTHH KLAX Enroute 0525
ANA1692 RJTT KLAX Enroute 2042
KAL11 RKSI KLAX Enroute 0044
AAL1408 KPHX KLAX Enroute 1951
DAL67 EGLL KLAX Departing
BAW526 EGLL KLAX Departing
DAL40 YSSY KLAX Departing

Los Angeles (SoCal) 20

Arrivals (1)

Callsign Dep Arr Status ETA
FDX1145 KOAK KSAN Enroute 1600

San Diego (SoCal) 1

Departures (1)

Callsign Dep Arr Status ETA
AAL8979 KBUR KSEA Enroute 1331

Burbank (SoCal) 1

Departures (3)

Callsign Dep Arr Status ETA
OEO412 KLAS EKCH Enroute 1244
KLM636 KLAS EHAM Enroute 1845
SWA701 KLAS KHOU Enroute 1110

Arrivals (2)

Callsign Dep Arr Status ETA
DAL216 KJFK KLAS Enroute 2253
N838TM KSEZ KHND Enroute 1119

Las Vegas 5
  • Flights To/From ZLA: 27
  • Flights in ZLA Airspace: 5
  • Controller Schedule

    December 8th, 2025

    Los Angeles Tower
    Maxwell Curtis

    Session with RK

    1700 - 1830 PST / 0100 - 0230 Zulu

    Bakersfield Approach (BFL)

    DATE VERSION CONTACT
    2024-06-19 3.50 Facility Advisory Board
    1. PURPOSE.
    This Standard Operating Procedure (SOP) outlines the procedures to be used by controllers working Bakersfield Approach to ensure that arrival flows are handled in as efficient and timely a manner as possible.

    2. ROLES AND RESPONSIBILITIES.
    The Office of Primary Responsibility (OPR) for this SOP is the ZLA Senior Staff. This SOP was signed and approved by Andrew Cleeremans, ZLA Chief Instructor, and ZLA Facility Chief Marc Sykes on December 30, 2003. This SOP shall be maintained, revised, updated or cancelled by the ZLA Staff or any other organization that supercedes, replaces or assumes the Staff responsibilities. Any suggestions for modification or amendment to this SOP should be sent to the ZLA Staff for review.

    3. DISTRIBUTION.
    This SOP is intended for use by controllers staffing Bakersfield Approach (BFL)

    4. BACKGROUND.
    This SOP will be the primary outline of Bakersfield Approach procedures

    5. REQUIREMENTS.
    1. Frequencies
      1. Bakersfield Approach 118.80
      2. Bakersfield Tower 118.10
      3. Bakersfield Ground 121.70
    2. Airspace
      1. Approach owns the airspace as shown on the TRACON graphic from SFC-13000’
    3. Special Instructions
      1. KBFL Runway use program
        1. Normal operations use runways 30L/R
        2. East operations use runways 12L/R when the wind is out of the northeast at greater than 10kts
      2. KBFL Arrivals
        1. FASTO STAR arrivals are received from ZLA 27 descending to 13000’. This arrival is designed to feed the ILS 30R but may be used when aircraft must circle to runway 12L/R
        2. Arrivals from ZOA will be received descending to 10000’
      3. KBFL Departures
        1. Initial climb in Approach airspace is 3000’
        2. MARIC, WRING SID departures are pilot navigated
        3. MEADOWS SID departures must be vectored on course