ZLA Logo
Who's Online
Online Controllers

No controllers online

Flights to/from ZLA

Departures (6)

Callsign Dep Arr Status ETA
QFA34 KLAX YSSY Enroute 1412
JAL15 KLAX RJTT Enroute 1421
UAE216 KLAX OMDB Enroute 1424
DAL7 KLAX RJTT Enroute 1923
DAL939 KLAX KJFK Enroute 1449
UAL842 KLAX YSSY Enroute 0031

Arrivals (9)

Callsign Dep Arr Status ETA
CFG080 EDDF KLAX Enroute 0222
UAE83M OMDB KLAX Enroute 0711
DAL12B YMML KLAX Enroute 1919
AAL1035 KPHL KLAX Enroute 2253
EVA012 RCTP KLAX Enroute 2329
CAO1069 ZSPD KLAX Enroute 2023
ACA775 CYUL KLAX Departing
AFR6205 LFPG KLAX Departing
BAW7DG EGLL KLAX Enroute 2230

Los Angeles (SoCal) 15

Departures (1)

Callsign Dep Arr Status ETA
BAW264 KSAN EGLL Enroute 1746

Arrivals (1)

Callsign Dep Arr Status ETA
VPG27 MMSD KSAN Enroute 0822

San Diego (SoCal) 2

Arrivals (1)

Callsign Dep Arr Status ETA
HIA101 PHOG KLGB Enroute 0320

Coast (SoCal) 1

Arrivals (2)

Callsign Dep Arr Status ETA
NBO4MK MPTO KVNY Enroute 1943
SWA1241 KMDW KBUR Departing

Burbank (SoCal) 2

Departures (2)

Callsign Dep Arr Status ETA
KAL006 KLAS RKSI Enroute 2004
ASA596 KLAS KPDX Enroute 0025

Arrivals (1)

Callsign Dep Arr Status ETA
SWA819 KTPA KLAS Enroute 2117

Las Vegas 3
  • Flights To/From ZLA: 23
  • Flights in ZLA Airspace: 2
  • Controller Schedule

    September 29th, 2026

    No sessions found for selected date

    Bakersfield Approach (BFL)

    DATE VERSION CONTACT
    2024-06-19 3.50 Facility Advisory Board
    1. PURPOSE.
    This Standard Operating Procedure (SOP) outlines the procedures to be used by controllers working Bakersfield Approach to ensure that arrival flows are handled in as efficient and timely a manner as possible.

    2. ROLES AND RESPONSIBILITIES.
    The Office of Primary Responsibility (OPR) for this SOP is the ZLA Senior Staff. This SOP was signed and approved by Andrew Cleeremans, ZLA Chief Instructor, and ZLA Facility Chief Marc Sykes on December 30, 2003. This SOP shall be maintained, revised, updated or cancelled by the ZLA Staff or any other organization that supercedes, replaces or assumes the Staff responsibilities. Any suggestions for modification or amendment to this SOP should be sent to the ZLA Staff for review.

    3. DISTRIBUTION.
    This SOP is intended for use by controllers staffing Bakersfield Approach (BFL)

    4. BACKGROUND.
    This SOP will be the primary outline of Bakersfield Approach procedures

    5. REQUIREMENTS.
    1. Frequencies
      1. Bakersfield Approach 118.80
      2. Bakersfield Tower 118.10
      3. Bakersfield Ground 121.70
    2. Airspace
      1. Approach owns the airspace as shown on the TRACON graphic from SFC-13000’
    3. Special Instructions
      1. KBFL Runway use program
        1. Normal operations use runways 30L/R
        2. East operations use runways 12L/R when the wind is out of the northeast at greater than 10kts
      2. KBFL Arrivals
        1. FASTO STAR arrivals are received from ZLA 27 descending to 13000’. This arrival is designed to feed the ILS 30R but may be used when aircraft must circle to runway 12L/R
        2. Arrivals from ZOA will be received descending to 10000’
      3. KBFL Departures
        1. Initial climb in Approach airspace is 3000’
        2. MARIC, WRING SID departures are pilot navigated
        3. MEADOWS SID departures must be vectored on course