ZLA Logo
Who's Online
Online Controllers

No controllers online

Flights to/from ZLA

Departures (9)

Callsign Dep Arr Status ETA
BAW28F KLAX EGLL Enroute 2249
KAL228 KLAX RJFR Enroute 1402
AAL83 KLAX EKCH Arriving
AAL073 KLAX YSSY Enroute 1754
UAL1038 KLAX KORD Enroute 1351
SIA7403 KLAX PHNL Enroute 1838
LNR77FM KLAX KLGA Enroute 1551
MAS159 KLAX RJAA Enroute 2241
VIR24J KLAX KSFO Enroute 1600

Arrivals (9)

Callsign Dep Arr Status ETA
BOX500 VHHH KLAX Enroute 0028
AUA81 LOWW KLAX Enroute 0700
DAL8 RJTT KLAX Enroute 2320
FDX638 PHNL KLAX Enroute 2114
SIA36 WSSS KLAX Enroute 0407
HFM44 CYYZ KLAX Enroute 2331
AFR22J LFPG KLAX Enroute 0258
VIR7 EGLL KLAX Enroute 0655
SIA7954 WSSS KLAX Departing

Los Angeles (SoCal) 18

Departures (1)

Callsign Dep Arr Status ETA
UAL2129 KSAN KIAD Enroute 1604

Arrivals (3)

Callsign Dep Arr Status ETA
SWA973 KCOS KSAN Enroute 2327
UAL540 KDEN KSAN Enroute 2305
QFA432 KIAD KSAN Departing

San Diego (SoCal) 4

Departures (1)

Callsign Dep Arr Status ETA
DAL1287 KLAS KIAH Enroute 1354

Arrivals (1)

Callsign Dep Arr Status ETA
DAL2261 KMSP KLAS Enroute 0737

Las Vegas 2
  • Flights To/From ZLA: 24
  • Flights in ZLA Airspace: 4
  • Controller Schedule

    December 3rd, 2025

    Socal Approach (Combined)
    Justin Nguyen

    Session with ER

    1730 - 1900 PST / 0130 - 0300 Zulu

    Bakersfield Approach (BFL)

    DATE VERSION CONTACT
    2024-06-19 3.50 Facility Advisory Board
    1. PURPOSE.
    This Standard Operating Procedure (SOP) outlines the procedures to be used by controllers working Bakersfield Approach to ensure that arrival flows are handled in as efficient and timely a manner as possible.

    2. ROLES AND RESPONSIBILITIES.
    The Office of Primary Responsibility (OPR) for this SOP is the ZLA Senior Staff. This SOP was signed and approved by Andrew Cleeremans, ZLA Chief Instructor, and ZLA Facility Chief Marc Sykes on December 30, 2003. This SOP shall be maintained, revised, updated or cancelled by the ZLA Staff or any other organization that supercedes, replaces or assumes the Staff responsibilities. Any suggestions for modification or amendment to this SOP should be sent to the ZLA Staff for review.

    3. DISTRIBUTION.
    This SOP is intended for use by controllers staffing Bakersfield Approach (BFL)

    4. BACKGROUND.
    This SOP will be the primary outline of Bakersfield Approach procedures

    5. REQUIREMENTS.
    1. Frequencies
      1. Bakersfield Approach 118.80
      2. Bakersfield Tower 118.10
      3. Bakersfield Ground 121.70
    2. Airspace
      1. Approach owns the airspace as shown on the TRACON graphic from SFC-13000’
    3. Special Instructions
      1. KBFL Runway use program
        1. Normal operations use runways 30L/R
        2. East operations use runways 12L/R when the wind is out of the northeast at greater than 10kts
      2. KBFL Arrivals
        1. FASTO STAR arrivals are received from ZLA 27 descending to 13000’. This arrival is designed to feed the ILS 30R but may be used when aircraft must circle to runway 12L/R
        2. Arrivals from ZOA will be received descending to 10000’
      3. KBFL Departures
        1. Initial climb in Approach airspace is 3000’
        2. MARIC, WRING SID departures are pilot navigated
        3. MEADOWS SID departures must be vectored on course