ZLA Logo
Who's Online
Online Controllers

No controllers online

Flights to/from ZLA

Departures (8)

Callsign Dep Arr Status ETA
CPA874 KLAX VHHX Enroute 0005
DAL56 KLAX RJTT Enroute 1511
AAL83 KLAX NZAA Enroute 1717
AAL2453 KLAX KBOS Enroute 1059
MXY781 KLAX KPVD Enroute 1120
TEJ517 KLAX SCEL Enroute 1735
AAL136 KLAX EGLL Arriving
UAL729 KLAX KORD Enroute 1600

Arrivals (10)

Callsign Dep Arr Status ETA
UAE83M OMDB KLAX Enroute 1948
CSG47W VHHH KLAX Enroute 1938
TAP247 LPPT KLAX Enroute 2055
BOX582 VHHH KLAX Enroute 1927
DAL1095 KSLC KLAX Enroute 2020
QFA11 YSSY KLAX Departing
DAL8 RJTT KLAX Departing
DAL2861 KSFO KLAX Enroute 2245
CCA982 VHHH KLAX Enroute 2020
KAC668 OKKK KLAX Enroute 1600

Los Angeles (SoCal) 18

Departures (3)

Callsign Dep Arr Status ETA
UPS599 KSAN EGLL Enroute 1307
NKS1722 KSAN KPDX Enroute 2117
DLH2P KSAN EDDM Enroute 2206

San Diego (SoCal) 3

Arrivals (1)

Callsign Dep Arr Status ETA
QFA55 KSJC KBUR Enroute 2013

Burbank (SoCal) 1

Departures (1)

Callsign Dep Arr Status ETA
VIR156 KLAS EGLL Enroute 1113

Arrivals (5)

Callsign Dep Arr Status ETA
KLM635 EHAM KLAS Enroute 1948
KLM636 EHAM KLAS Enroute 2009
AIRGUN1 KRFD KLAS Enroute 2153
BAW2MW EGLL KLAS Enroute 0137
OCN11 EDDF KLAS Departing

Las Vegas 6
  • Flights To/From ZLA: 28
  • Flights in ZLA Airspace: 4
  • Controller Schedule

    September 3rd, 2026

    No sessions found for selected date

    Bakersfield Approach (BFL)

    DATE VERSION CONTACT
    2024-06-19 3.50 Facility Advisory Board
    1. PURPOSE.
    This Standard Operating Procedure (SOP) outlines the procedures to be used by controllers working Bakersfield Approach to ensure that arrival flows are handled in as efficient and timely a manner as possible.

    2. ROLES AND RESPONSIBILITIES.
    The Office of Primary Responsibility (OPR) for this SOP is the ZLA Senior Staff. This SOP was signed and approved by Andrew Cleeremans, ZLA Chief Instructor, and ZLA Facility Chief Marc Sykes on December 30, 2003. This SOP shall be maintained, revised, updated or cancelled by the ZLA Staff or any other organization that supercedes, replaces or assumes the Staff responsibilities. Any suggestions for modification or amendment to this SOP should be sent to the ZLA Staff for review.

    3. DISTRIBUTION.
    This SOP is intended for use by controllers staffing Bakersfield Approach (BFL)

    4. BACKGROUND.
    This SOP will be the primary outline of Bakersfield Approach procedures

    5. REQUIREMENTS.
    1. Frequencies
      1. Bakersfield Approach 118.80
      2. Bakersfield Tower 118.10
      3. Bakersfield Ground 121.70
    2. Airspace
      1. Approach owns the airspace as shown on the TRACON graphic from SFC-13000’
    3. Special Instructions
      1. KBFL Runway use program
        1. Normal operations use runways 30L/R
        2. East operations use runways 12L/R when the wind is out of the northeast at greater than 10kts
      2. KBFL Arrivals
        1. FASTO STAR arrivals are received from ZLA 27 descending to 13000’. This arrival is designed to feed the ILS 30R but may be used when aircraft must circle to runway 12L/R
        2. Arrivals from ZOA will be received descending to 10000’
      3. KBFL Departures
        1. Initial climb in Approach airspace is 3000’
        2. MARIC, WRING SID departures are pilot navigated
        3. MEADOWS SID departures must be vectored on course