ZLA Logo
Who's Online
Online Controllers

No controllers online

Flights to/from ZLA

Departures (5)

Callsign Dep Arr Status ETA
DAL41 KLAX YSSY Enroute 1955
ANZ5 KLAX NZAA Enroute 1920
JBU724 KLAX KJFK Enroute 1734
DLH457 KLAX EDDF Enroute 2250
DAL10 KLAX KSFO Enroute 1600

Arrivals (3)

Callsign Dep Arr Status ETA
BAW1XS EGLL KLAX Enroute 0449
BAW7D EGLL KLAX Enroute 0734
AAL121 YSSY KLAX Departing

Los Angeles (SoCal) 8

Departures (1)

Callsign Dep Arr Status ETA
CXA557 KONT PHNL Enroute 0035

Empire (SoCal) 1

Departures (4)

Callsign Dep Arr Status ETA
AAL3 KNZY KMGE Enroute 1531
BAW9SW KSAN EGLL Enroute 2147
GAF915 KNFG KLSV Enroute 1638
FDX1222 KSAN KMEM Enroute 1547

Arrivals (3)

Callsign Dep Arr Status ETA
BAW44N EGLL KSAN Enroute 0531
AAL689 KMIA KSAN Departing
DAL894 KATL KSAN Departing

San Diego (SoCal) 7

Departures (2)

Callsign Dep Arr Status ETA
VST3119 KLAS KEWR Enroute 1741
SWA187 KLAS KRNO Enroute 1600

Arrivals (4)

Callsign Dep Arr Status ETA
FDX1874 KOAK KLAS Enroute 2341
DAL455 KSLC KLAS Enroute 1322
PDT9979 KSLC KLAS Enroute 0652
UAL446 KEWR KLAS Departing

Las Vegas 6

Arrivals (1)

Callsign Dep Arr Status ETA
GAF915 KNFG KLSV Enroute 1638

Nellis 1

Arrivals (1)

Callsign Dep Arr Status ETA
9AWPL KGCN KGCN Enroute 2030

Other 1
  • Flights To/From ZLA: 24
  • Flights in ZLA Airspace: 9
  • Controller Schedule

    March 10th, 2026

    No sessions found for selected date

    Bakersfield Approach (BFL)

    DATE VERSION CONTACT
    2024-06-19 3.50 Facility Advisory Board
    1. PURPOSE.
    This Standard Operating Procedure (SOP) outlines the procedures to be used by controllers working Bakersfield Approach to ensure that arrival flows are handled in as efficient and timely a manner as possible.

    2. ROLES AND RESPONSIBILITIES.
    The Office of Primary Responsibility (OPR) for this SOP is the ZLA Senior Staff. This SOP was signed and approved by Andrew Cleeremans, ZLA Chief Instructor, and ZLA Facility Chief Marc Sykes on December 30, 2003. This SOP shall be maintained, revised, updated or cancelled by the ZLA Staff or any other organization that supercedes, replaces or assumes the Staff responsibilities. Any suggestions for modification or amendment to this SOP should be sent to the ZLA Staff for review.

    3. DISTRIBUTION.
    This SOP is intended for use by controllers staffing Bakersfield Approach (BFL)

    4. BACKGROUND.
    This SOP will be the primary outline of Bakersfield Approach procedures

    5. REQUIREMENTS.
    1. Frequencies
      1. Bakersfield Approach 118.80
      2. Bakersfield Tower 118.10
      3. Bakersfield Ground 121.70
    2. Airspace
      1. Approach owns the airspace as shown on the TRACON graphic from SFC-13000’
    3. Special Instructions
      1. KBFL Runway use program
        1. Normal operations use runways 30L/R
        2. East operations use runways 12L/R when the wind is out of the northeast at greater than 10kts
      2. KBFL Arrivals
        1. FASTO STAR arrivals are received from ZLA 27 descending to 13000’. This arrival is designed to feed the ILS 30R but may be used when aircraft must circle to runway 12L/R
        2. Arrivals from ZOA will be received descending to 10000’
      3. KBFL Departures
        1. Initial climb in Approach airspace is 3000’
        2. MARIC, WRING SID departures are pilot navigated
        3. MEADOWS SID departures must be vectored on course