ZLA Logo
Who's Online
Online Controllers

No controllers online

Flights to/from ZLA

Departures (8)

Callsign Dep Arr Status ETA
CAL2806 KLAX RJBB Enroute 1352
DAL41 KLAX YSSY Enroute 2039
KLM602 KLAX EHAM Enroute 1721
SIA35 KLAX WSSS Enroute 1319
SWA3449 KLAX KABQ Enroute 1600
AAY9420 KLAX KOAK Enroute 1600
SWR41G KLAX LSZH Enroute 1059
BAW282 KLAX EGLL Enroute 1438

Arrivals (8)

Callsign Dep Arr Status ETA
SIA7448 RJGG KLAX Enroute 2201
DAL42 YSSY KLAX Enroute 1731
AAL1085 KDFW KLAX Enroute 2125
KAL17 RKSI KLAX Enroute 0050
UAE217 OMDB KLAX Enroute 2144
HFA41 KATL KLAX Departing
CAL006 RCTP KLAX Enroute 1927
BOX474 EDDF KLAX Enroute 0405

Los Angeles (SoCal) 16

Departures (3)

Callsign Dep Arr Status ETA
UAL1827 KSAN KEWR Enroute 1103
N700LE KSAN EGLF Enroute 1037
BAW9SW KSAN EGLL Enroute 1600

San Diego (SoCal) 3

Arrivals (1)

Callsign Dep Arr Status ETA
SWA2828 KLAS KSNA Enroute 1600

Coast (SoCal) 1

Departures (4)

Callsign Dep Arr Status ETA
SWA2828 KLAS KSNA Enroute 1600
AAL1297 KLAS KMIA Enroute 1805
AAL1808 KLAS KPHX Enroute 0503
CPA887 KLAS VHHH Enroute 1600

Arrivals (2)

Callsign Dep Arr Status ETA
TWA41 PHNL KLAS Enroute 1916
JBU957 KEWR KLAS Departing

Las Vegas 6
  • Flights To/From ZLA: 26
  • Flights in ZLA Airspace: 11
  • Controller Schedule

    February 11th, 2026

    Socal Approach (West)
    James Dresden

    Session with LL

    1630 - 1800 PST / 0030 - 0200 Zulu

    Bakersfield Approach (BFL)

    DATE VERSION CONTACT
    2024-06-19 3.50 Facility Advisory Board
    1. PURPOSE.
    This Standard Operating Procedure (SOP) outlines the procedures to be used by controllers working Bakersfield Approach to ensure that arrival flows are handled in as efficient and timely a manner as possible.

    2. ROLES AND RESPONSIBILITIES.
    The Office of Primary Responsibility (OPR) for this SOP is the ZLA Senior Staff. This SOP was signed and approved by Andrew Cleeremans, ZLA Chief Instructor, and ZLA Facility Chief Marc Sykes on December 30, 2003. This SOP shall be maintained, revised, updated or cancelled by the ZLA Staff or any other organization that supercedes, replaces or assumes the Staff responsibilities. Any suggestions for modification or amendment to this SOP should be sent to the ZLA Staff for review.

    3. DISTRIBUTION.
    This SOP is intended for use by controllers staffing Bakersfield Approach (BFL)

    4. BACKGROUND.
    This SOP will be the primary outline of Bakersfield Approach procedures

    5. REQUIREMENTS.
    1. Frequencies
      1. Bakersfield Approach 118.80
      2. Bakersfield Tower 118.10
      3. Bakersfield Ground 121.70
    2. Airspace
      1. Approach owns the airspace as shown on the TRACON graphic from SFC-13000’
    3. Special Instructions
      1. KBFL Runway use program
        1. Normal operations use runways 30L/R
        2. East operations use runways 12L/R when the wind is out of the northeast at greater than 10kts
      2. KBFL Arrivals
        1. FASTO STAR arrivals are received from ZLA 27 descending to 13000’. This arrival is designed to feed the ILS 30R but may be used when aircraft must circle to runway 12L/R
        2. Arrivals from ZOA will be received descending to 10000’
      3. KBFL Departures
        1. Initial climb in Approach airspace is 3000’
        2. MARIC, WRING SID departures are pilot navigated
        3. MEADOWS SID departures must be vectored on course