ZLA Logo
Who's Online
Online Controllers

No controllers online

Flights to/from ZLA

Departures (5)

Callsign Dep Arr Status ETA
DAL11 KLAX YMML Enroute 1722
AAL129 KLAX KLAS Enroute 0334
AFR028 KLAX NTAA Enroute 1507
PAA1 KLAX RJAA Enroute 2246
CHH440 KLAX PANC Enroute 0450

Arrivals (16)

Callsign Dep Arr Status ETA
CCA983 ZBAA KLAX Enroute 2217
CES21 ZBAA KLAX Enroute 2225
KAL11 RKSI KLAX Enroute 2311
BOX500A VHHH KLAX Enroute 0007
AFR28A LFPG KLAX Enroute 0340
SWR40 LSZH KLAX Enroute 0456
AFR2102 KATL KLAX Enroute 0059
DAL612 PHNL KLAX Enroute 2113
ASA1419 MMGL KLAX Enroute 2255
DAL500 KATL KLAX Enroute 0046
AAL1376 KPHX KLAX Enroute 0146
DAL40 YSSY KLAX Enroute 0056
DAL41 YSSY KLAX Enroute 1953
DAL69 KMSP KLAX Enroute 0020
UAL842 YSSY KLAX Enroute 1810
BAW283 EGLL KLAX Departing

Los Angeles (SoCal) 21

Departures (1)

Callsign Dep Arr Status ETA
ENY2687 KSAN KDFW Enroute 1600

Arrivals (1)

Callsign Dep Arr Status ETA
EJA725 KVNY KSAN Enroute 1600

San Diego (SoCal) 2

Departures (1)

Callsign Dep Arr Status ETA
EJA725 KVNY KSAN Enroute 1600

Burbank (SoCal) 1

Departures (1)

Callsign Dep Arr Status ETA
LAN7701 KLAS VHHH Enroute 1339

Arrivals (3)

Callsign Dep Arr Status ETA
DAL825 KATL KLAS Enroute 0137
AAL129 KLAX KLAS Enroute 0334
FFT4709 KDFW KLAS Enroute 0153

Las Vegas 4
  • Flights To/From ZLA: 28
  • Flights in ZLA Airspace: 5
  • Controller Schedule

    April 28th, 2026

    Lindbergh Ground
    Levi Sherman

    1730 - 2000 PDT / 0030 - 0300 Zulu

    Point Mugu Approach (NTD)

    DATE VERSION CONTACT
    2025-05-13 3.20 Facility Advisory Board
    1. PURPOSE.
    This Standard Operating Procedure (SOP) outlines the procedures to be used by controllers working Point Mugu Approach to ensure that arrival flows are handled in as efficient and timely a manner as possible.

    2. ROLES AND RESPONSIBILITIES.
    The Office of Primary Responsibility (OPR) for this SOP is the ZLA Senior Staff. This SOP was approved by the Staff on January 1, 2003. This SOP shall be maintained, revised, updated or canceled by the ZLA Senior Staff and Facility Engineering Team. Any suggestions for modification or amendment to this SOP should be sent to the OPR for review.

    3. DISTRIBUTION.
    This SOP is intended for use by controllers staffing Point Mugu Approach (NTD_APP)

    4. BACKGROUND.
    This SOP will be the primary outline of Point Mugu Approach procedures

    5. REQUIREMENTS.
    1. Frequencies
      1. Point Mugu Approach 124.70
      2. Point Mugu Tower 124.85
      3. Point Mugu Ground 121.60
      4. Point Mugu Clearance Delivery 120.75
      5. All other positions within the Point Mugu RAPCON will use frequencies prescribed in the Minor Airport Reference Sheet.
    2. Airspace
      1. Point Mugu Approach owns the airspace as depicted on the video map from SFC-8000, excluding the area known as Plead Control unless otherwise coordinated. 
    3. Special Instructions
      1. KCMA/KOXR Arrivals will be received from the SOCAL Burbank Area established on the final approach course and cleared for the approach. These aircraft must be monitored and handled if they go missed