ZLA Logo
Who's Online
Online Controllers

No controllers online

Flights to/from ZLA

Departures (8)

Callsign Dep Arr Status ETA
UAL6517 KLAX VHHH Enroute 1951
UAE216 KLAX OMDB Enroute 1256
ETD171 KLAX OMAA Enroute 1507
UAL027 KLAX MMUN Enroute 1812
UAL95 KLAX KBOS Enroute 1618
DAL41 KLAX YSSY Enroute 1302
UAL580 KLAX KORD Enroute 0057
ACL342 KLAX KSFO Enroute 1600

Arrivals (7)

Callsign Dep Arr Status ETA
QFA15 YBBN KLAX Enroute 2016
FDX81 LIRF KLAX Enroute 0133
DAL4041 KBOS KLAX Enroute 0012
ASA21V KSEA KLAX Enroute 2243
AAL960 KMIA KLAX Departing
AAL2388 KPHX KLAX Enroute 0028
PAA516 KSFO KLAX Enroute 1600

Los Angeles (SoCal) 15

Arrivals (3)

Callsign Dep Arr Status ETA
DLH5Y EDDM KSAN Enroute 0620
DAL369 KDTW KSAN Enroute 0026
DLH466 EDDF KSAN Enroute 0729

San Diego (SoCal) 3

Departures (1)

Callsign Dep Arr Status ETA
UAL92 KBUR UMGG Enroute 2326

Arrivals (1)

Callsign Dep Arr Status ETA
QFA55 KLAS KBUR Enroute 1600

Burbank (SoCal) 2

Departures (1)

Callsign Dep Arr Status ETA
QFA55 KLAS KBUR Enroute 1600

Arrivals (1)

Callsign Dep Arr Status ETA
DAL25W KORD KLAS Enroute 0039

Las Vegas 2

Departures (1)

Callsign Dep Arr Status ETA
TPC36 KSBP KMRY Enroute 2002

Santa Barbara 1

Departures (1)

Callsign Dep Arr Status ETA
CTV6118 KVCV MMMX Enroute 1300

Edwards 1
  • Flights To/From ZLA: 24
  • Flights in ZLA Airspace: 4
  • Controller Schedule

    September 14th, 2026

    No sessions found for selected date

    Point Mugu Approach (NTD)

    DATE VERSION CONTACT
    2025-05-13 3.20 Facility Advisory Board
    1. PURPOSE.
    This Standard Operating Procedure (SOP) outlines the procedures to be used by controllers working Point Mugu Approach to ensure that arrival flows are handled in as efficient and timely a manner as possible.

    2. ROLES AND RESPONSIBILITIES.
    The Office of Primary Responsibility (OPR) for this SOP is the ZLA Senior Staff. This SOP was approved by the Staff on January 1, 2003. This SOP shall be maintained, revised, updated or canceled by the ZLA Senior Staff and Facility Engineering Team. Any suggestions for modification or amendment to this SOP should be sent to the OPR for review.

    3. DISTRIBUTION.
    This SOP is intended for use by controllers staffing Point Mugu Approach (NTD_APP)

    4. BACKGROUND.
    This SOP will be the primary outline of Point Mugu Approach procedures

    5. REQUIREMENTS.
    1. Frequencies
      1. Point Mugu Approach 124.70
      2. Point Mugu Tower 124.85
      3. Point Mugu Ground 121.60
      4. Point Mugu Clearance Delivery 120.75
      5. All other positions within the Point Mugu RAPCON will use frequencies prescribed in the Minor Airport Reference Sheet.
    2. Airspace
      1. Point Mugu Approach owns the airspace as depicted on the video map from SFC-8000, excluding the area known as Plead Control unless otherwise coordinated. 
    3. Special Instructions
      1. KCMA/KOXR Arrivals will be received from the SOCAL Burbank Area established on the final approach course and cleared for the approach. These aircraft must be monitored and handled if they go missed