ZLA Logo
Who's Online
Online Controllers Flights to/from ZLA

Departures (10)

Callsign Dep Arr Status ETA
UAL1158 KLAX PHNL Enroute 1455
THT8 KLAX LFPG Enroute 1532
AFR026 KLAX NTAA Enroute 1116
ANZ5 KLAX NZAA Enroute 1909
WAT381 KLAX KASE Enroute 2353
UPS2905 KLAX KDFW Enroute 0942
UAL1314 KLAX KORD Enroute 1600
UAL39 KLAX RJTT Enroute 0916
SJX001 KLAX RCTP Enroute 1305
DAL011 KLAX YMML Enroute 0916

Arrivals (9)

Callsign Dep Arr Status ETA
PAL711 RPLL KLAX Enroute 1704
DLH452 EDDM KLAX Enroute 1913
GIA666 RJAA KLAX Enroute 1837
DLH456 EDDF KLAX Enroute 2244
CKS724 RKSI KLAX Enroute 1939
IBE03ZB LEMD KLAX Enroute 0140
DAL1559 KSFO KLAX Enroute 1807
JBU2501 KFLL KLAX Enroute 1911
KAL11A RKSI KLAX Departing

Los Angeles (SoCal) 19

Departures (1)

Callsign Dep Arr Status ETA
SJX009 KONT RCTP Enroute 1922

Empire (SoCal) 1

Departures (2)

Callsign Dep Arr Status ETA
BAW272 KSAN EGLL Enroute 1148
DAL10 KSAN EKCH Enroute 1644

Arrivals (1)

Callsign Dep Arr Status ETA
BAW273 EGLL KSAN Enroute 2118

San Diego (SoCal) 3

Departures (1)

Callsign Dep Arr Status ETA
BAW991 KLAS EGLL Enroute 0916

Arrivals (4)

Callsign Dep Arr Status ETA
FFT76 KOKC KLAS Enroute 1010
AAY518 KOKC KLAS Enroute 2221
DAL1510 KOKC KLAS Enroute 1959
BAW271 EGLL KLAS Enroute 0110

Las Vegas 5
  • Flights To/From ZLA: 28
  • Flights in ZLA Airspace: 6
  • Controller Schedule

    June 1st, 2026

    Lindbergh Ground
    Levi Sherman

    It's the first of the month!

    0800 - 1000 PDT / 1500 - 1700 Zulu

    Point Mugu Approach (NTD)

    DATE VERSION CONTACT
    2025-05-13 3.20 Facility Advisory Board
    1. PURPOSE.
    This Standard Operating Procedure (SOP) outlines the procedures to be used by controllers working Point Mugu Approach to ensure that arrival flows are handled in as efficient and timely a manner as possible.

    2. ROLES AND RESPONSIBILITIES.
    The Office of Primary Responsibility (OPR) for this SOP is the ZLA Senior Staff. This SOP was approved by the Staff on January 1, 2003. This SOP shall be maintained, revised, updated or canceled by the ZLA Senior Staff and Facility Engineering Team. Any suggestions for modification or amendment to this SOP should be sent to the OPR for review.

    3. DISTRIBUTION.
    This SOP is intended for use by controllers staffing Point Mugu Approach (NTD_APP)

    4. BACKGROUND.
    This SOP will be the primary outline of Point Mugu Approach procedures

    5. REQUIREMENTS.
    1. Frequencies
      1. Point Mugu Approach 124.70
      2. Point Mugu Tower 124.85
      3. Point Mugu Ground 121.60
      4. Point Mugu Clearance Delivery 120.75
      5. All other positions within the Point Mugu RAPCON will use frequencies prescribed in the Minor Airport Reference Sheet.
    2. Airspace
      1. Point Mugu Approach owns the airspace as depicted on the video map from SFC-8000, excluding the area known as Plead Control unless otherwise coordinated. 
    3. Special Instructions
      1. KCMA/KOXR Arrivals will be received from the SOCAL Burbank Area established on the final approach course and cleared for the approach. These aircraft must be monitored and handled if they go missed