ZLA Logo
Who's Online
Online Controllers

No controllers online

Flights to/from ZLA

Departures (11)

Callsign Dep Arr Status ETA
KLM623 KLAX EHAM Enroute 0842
AUH02 KLAX OMAA Enroute 1339
VIR8Y KLAX EGLL Enroute 0955
SAS932 KLAX EKCH Enroute 1221
UAL310 KLAX ESSA Enroute 1637
FDX3CM KLAX KMSP Enroute 0811
AAL73 KLAX YSSY Enroute 1954
THY10 KLAX LTFM Enroute 1952
KAY350 KLAX KATL Enroute 0943
ABX3187 KLAX KSFO Enroute 0012
UAL98 KLAX YMML Enroute 0804

Arrivals (4)

Callsign Dep Arr Status ETA
DAL88 VHHH KLAX Enroute 1725
DAL291 LFPG KLAX Enroute 2240
JAL16 RJTT KLAX Enroute 1907
AAL162 PHNL KLAX Enroute 1506

Los Angeles (SoCal) 15

Departures (1)

Callsign Dep Arr Status ETA
SJX009 KONT RCTP Enroute 1922

Arrivals (1)

Callsign Dep Arr Status ETA
FDX223 KSDF KONT Departing

Empire (SoCal) 2

Departures (1)

Callsign Dep Arr Status ETA
UAL5432 KSAN KBOS Enroute 1143

Arrivals (1)

Callsign Dep Arr Status ETA
ASA547 MMSD KSAN Enroute 1804

San Diego (SoCal) 2

Arrivals (1)

Callsign Dep Arr Status ETA
SWA2741 KMDW KBUR Enroute 2106

Burbank (SoCal) 1

Arrivals (1)

Callsign Dep Arr Status ETA
ANA005 RJOA KPSP Enroute 1549

Palm Springs (SoCal) 1

Departures (1)

Callsign Dep Arr Status ETA
SWA3200 KLAS KMDW Enroute 0811

Las Vegas 1
  • Flights To/From ZLA: 22
  • Flights in ZLA Airspace: 2
  • Controller Schedule

    June 9th, 2026

    No sessions found for selected date

    Point Mugu Approach (NTD)

    DATE VERSION CONTACT
    2025-05-13 3.20 Facility Advisory Board
    1. PURPOSE.
    This Standard Operating Procedure (SOP) outlines the procedures to be used by controllers working Point Mugu Approach to ensure that arrival flows are handled in as efficient and timely a manner as possible.

    2. ROLES AND RESPONSIBILITIES.
    The Office of Primary Responsibility (OPR) for this SOP is the ZLA Senior Staff. This SOP was approved by the Staff on January 1, 2003. This SOP shall be maintained, revised, updated or canceled by the ZLA Senior Staff and Facility Engineering Team. Any suggestions for modification or amendment to this SOP should be sent to the OPR for review.

    3. DISTRIBUTION.
    This SOP is intended for use by controllers staffing Point Mugu Approach (NTD_APP)

    4. BACKGROUND.
    This SOP will be the primary outline of Point Mugu Approach procedures

    5. REQUIREMENTS.
    1. Frequencies
      1. Point Mugu Approach 124.70
      2. Point Mugu Tower 124.85
      3. Point Mugu Ground 121.60
      4. Point Mugu Clearance Delivery 120.75
      5. All other positions within the Point Mugu RAPCON will use frequencies prescribed in the Minor Airport Reference Sheet.
    2. Airspace
      1. Point Mugu Approach owns the airspace as depicted on the video map from SFC-8000, excluding the area known as Plead Control unless otherwise coordinated. 
    3. Special Instructions
      1. KCMA/KOXR Arrivals will be received from the SOCAL Burbank Area established on the final approach course and cleared for the approach. These aircraft must be monitored and handled if they go missed