ZLA Logo
Who's Online
Online Controllers

No controllers online

Flights to/from ZLA

Departures (7)

Callsign Dep Arr Status ETA
MSR984 KLAX HECA Enroute 1516
AAL83 KLAX NZAA Enroute 1613
AAL2453 KLAX KBOS Arriving
AAL31 KLAX PHNL Enroute 2003
DHK51 KLAX EGNX Enroute 1833
QFA12 KLAX YSSY Enroute 1204
FDX411 KLAX KSFO Enroute 1600

Arrivals (13)

Callsign Dep Arr Status ETA
THY45T LTFM KLAX Enroute 2253
VSP890 SBGR KLAX Enroute 2012
DAL8 RJTT KLAX Enroute 1812
ANA126 RJTT KLAX Enroute 2214
BAW637 EGLL KLAX Enroute 0013
VIR23X EGLL KLAX Enroute 0112
AFR040 LFMN KLAX Enroute 0229
ANZ6 NZAA KLAX Enroute 1740
SWR40 LSZH KLAX Enroute 0314
UAL2127 KSFO KLAX Enroute 2330
AZU2005 SBGR KLAX Enroute 2002
CAL5382 RCTP KLAX Enroute 2118
KAL017 RKSI KLAX Enroute 2135

Los Angeles (SoCal) 20

Departures (1)

Callsign Dep Arr Status ETA
UAL1316 KONT KDEN Enroute 1751

Empire (SoCal) 1

Departures (1)

Callsign Dep Arr Status ETA
SWA4074 KSAN PHNL Enroute 1738

Arrivals (4)

Callsign Dep Arr Status ETA
DLH5Y EDDM KSAN Enroute 2112
EAL510 RJAA KSAN Enroute 2017
BAW265 EGLL KSAN Enroute 0310
SWA1930 KPHX KSAN Enroute 1600

San Diego (SoCal) 5

Arrivals (1)

Callsign Dep Arr Status ETA
ROU1703 CYYZ KLAS Enroute 2228

Las Vegas 1

Departures (1)

Callsign Dep Arr Status ETA
VHRAQ KSBA KMRY Enroute 1711

Santa Barbara 1
  • Flights To/From ZLA: 28
  • Flights in ZLA Airspace: 3
  • Controller Schedule

    June 3rd, 2026

    Socal Approach (West)
    Maxwell Curtis

    Session with RK

    1700 - 1830 PDT / 0000 - 0130 Zulu

    Point Mugu Approach (NTD)

    DATE VERSION CONTACT
    2025-05-13 3.20 Facility Advisory Board
    1. PURPOSE.
    This Standard Operating Procedure (SOP) outlines the procedures to be used by controllers working Point Mugu Approach to ensure that arrival flows are handled in as efficient and timely a manner as possible.

    2. ROLES AND RESPONSIBILITIES.
    The Office of Primary Responsibility (OPR) for this SOP is the ZLA Senior Staff. This SOP was approved by the Staff on January 1, 2003. This SOP shall be maintained, revised, updated or canceled by the ZLA Senior Staff and Facility Engineering Team. Any suggestions for modification or amendment to this SOP should be sent to the OPR for review.

    3. DISTRIBUTION.
    This SOP is intended for use by controllers staffing Point Mugu Approach (NTD_APP)

    4. BACKGROUND.
    This SOP will be the primary outline of Point Mugu Approach procedures

    5. REQUIREMENTS.
    1. Frequencies
      1. Point Mugu Approach 124.70
      2. Point Mugu Tower 124.85
      3. Point Mugu Ground 121.60
      4. Point Mugu Clearance Delivery 120.75
      5. All other positions within the Point Mugu RAPCON will use frequencies prescribed in the Minor Airport Reference Sheet.
    2. Airspace
      1. Point Mugu Approach owns the airspace as depicted on the video map from SFC-8000, excluding the area known as Plead Control unless otherwise coordinated. 
    3. Special Instructions
      1. KCMA/KOXR Arrivals will be received from the SOCAL Burbank Area established on the final approach course and cleared for the approach. These aircraft must be monitored and handled if they go missed