ZLA Logo
Who's Online
Online Controllers Flights to/from ZLA

Departures (3)

Callsign Dep Arr Status ETA
ANZ5 KLAX NZAA Enroute 1540
UAE9GR KLAX OMDB Enroute 1450
DAL1490 KLAX KATL Enroute 1109

Arrivals (12)

Callsign Dep Arr Status ETA
ASY32 YBBN KLAX Enroute 2026
DLH452 EDDM KLAX Enroute 0230
GTI361 RJAA KLAX Enroute 2101
DAL40 YSSY KLAX Enroute 1827
QFA12 YSSY KLAX Enroute 1843
FIN1 EFHK KLAX Enroute 0621
PAL112 RPLL KLAX Enroute 1247
DLH456 EDDF KLAX Departing
AAL2331 KMIA KLAX Departing
TAP247 LPPT KLAX Departing
PAL122 RPLL KLAX Enroute 1344
AAL135 EGLL KLAX Enroute 2136

Los Angeles (SoCal) 15

Departures (1)

Callsign Dep Arr Status ETA
DAL1220 KONT KORD Enroute 1303

Empire (SoCal) 1

Departures (1)

Callsign Dep Arr Status ETA
N817KM KSAN KSFO Enroute 0100

Arrivals (2)

Callsign Dep Arr Status ETA
KLM639 EHAM KSAN Departing
KLM641 EHAM KSAN Departing

San Diego (SoCal) 3

Arrivals (3)

Callsign Dep Arr Status ETA
EJA750 RCTP KSNA Enroute 2318
AOJ1N LOWS KLGB Enroute 1600
GCK18 LOWS KLGB Enroute 1917

Coast (SoCal) 3

Departures (4)

Callsign Dep Arr Status ETA
DAL774 KLAS SKBO Enroute 1250
FDX1776 KLAS OMDB Arriving
AAY2 KLAS KMFE Enroute 1256
T7ACE KHND PAJN Enroute 1600

Arrivals (1)

Callsign Dep Arr Status ETA
UKV6017 MPTO KLAS Enroute 1735

Las Vegas 5

Arrivals (1)

Callsign Dep Arr Status ETA
SAM37 KORD KLSV Enroute 2032

Nellis 1
  • Flights To/From ZLA: 28
  • Flights in ZLA Airspace: 6
  • Controller Schedule

    November 27th, 2026

    No sessions found for selected date

    Point Mugu Approach (NTD)

    DATE VERSION CONTACT
    2025-05-13 3.20 Facility Advisory Board
    1. PURPOSE.
    This Standard Operating Procedure (SOP) outlines the procedures to be used by controllers working Point Mugu Approach to ensure that arrival flows are handled in as efficient and timely a manner as possible.

    2. ROLES AND RESPONSIBILITIES.
    The Office of Primary Responsibility (OPR) for this SOP is the ZLA Senior Staff. This SOP was approved by the Staff on January 1, 2003. This SOP shall be maintained, revised, updated or canceled by the ZLA Senior Staff and Facility Engineering Team. Any suggestions for modification or amendment to this SOP should be sent to the OPR for review.

    3. DISTRIBUTION.
    This SOP is intended for use by controllers staffing Point Mugu Approach (NTD_APP)

    4. BACKGROUND.
    This SOP will be the primary outline of Point Mugu Approach procedures

    5. REQUIREMENTS.
    1. Frequencies
      1. Point Mugu Approach 124.70
      2. Point Mugu Tower 124.85
      3. Point Mugu Ground 121.60
      4. Point Mugu Clearance Delivery 120.75
      5. All other positions within the Point Mugu RAPCON will use frequencies prescribed in the Minor Airport Reference Sheet.
    2. Airspace
      1. Point Mugu Approach owns the airspace as depicted on the video map from SFC-8000, excluding the area known as Plead Control unless otherwise coordinated. 
    3. Special Instructions
      1. KCMA/KOXR Arrivals will be received from the SOCAL Burbank Area established on the final approach course and cleared for the approach. These aircraft must be monitored and handled if they go missed