ZLA Logo
Who's Online
Online Controllers

No controllers online

Flights to/from ZLA

Departures (12)

Callsign Dep Arr Status ETA
ANA105 KLAX RJTT Enroute 0841
DLH457 KLAX EDDF Enroute 0912
AAL83 KLAX NZAA Enroute 1651
N9XZ KLAX KSEA Enroute 0555
FDX3685 KLAX KSEA Enroute 1600
UAE216 KLAX OMDB Enroute 1302
QAK1721 KLAX MMGL Enroute 1347
AAL5008 KLAX KOKC Enroute 0847
DLH453 KLAX EDDM Enroute 0934
UAL210 KLAX KIAH Enroute 0913
CAL2447 KLAX ZSPD Enroute 1822
AXY82N KLAX EGKK Enroute 0801

Arrivals (8)

Callsign Dep Arr Status ETA
SAS9CA EKCH KLAX Enroute 1651
WGN1604 VHHH KLAX Enroute 1839
DAL42 YSSY KLAX Enroute 1413
SJX15 RCTP KLAX Enroute 1838
UAE83M OMDB KLAX Enroute 0516
DAL297 YSSY KLAX Enroute 1513
SWA360 KBNA KLAX Enroute 1739
DAL908 KDTW KLAX Departing

Los Angeles (SoCal) 20

Arrivals (1)

Callsign Dep Arr Status ETA
ASA271 PHNL KONT Enroute 2323

Empire (SoCal) 1

Departures (3)

Callsign Dep Arr Status ETA
VGI96 KSAN EGLL Enroute 1006
WOA390 KSAN KBOS Enroute 1125
AAL1423 KSAN KPDX Enroute 2012

San Diego (SoCal) 3

Arrivals (2)

Callsign Dep Arr Status ETA
FFT1216 KSEA KLAS Enroute 1725
SWA1821 KSEA KLAS Enroute 1935

Las Vegas 2
  • Flights To/From ZLA: 26
  • Flights in ZLA Airspace: 5
  • Controller Schedule

    January 15th, 2026

    Los Angeles Center
    Shez Ansari

    0630 - 0830 PST / 1430 - 1630 Zulu

    Lindbergh Tower
    August Riss

    Session with RK

    1700 - 1830 PST / 0100 - 0230 Zulu

    Lindbergh Tower
    Marc Bracco

    Session with CH

    1830 - 2000 PST / 0230 - 0400 Zulu

    Point Mugu Approach (NTD)

    DATE VERSION CONTACT
    2025-05-13 3.20 Facility Advisory Board
    1. PURPOSE.
    This Standard Operating Procedure (SOP) outlines the procedures to be used by controllers working Point Mugu Approach to ensure that arrival flows are handled in as efficient and timely a manner as possible.

    2. ROLES AND RESPONSIBILITIES.
    The Office of Primary Responsibility (OPR) for this SOP is the ZLA Senior Staff. This SOP was approved by the Staff on January 1, 2003. This SOP shall be maintained, revised, updated or canceled by the ZLA Senior Staff and Facility Engineering Team. Any suggestions for modification or amendment to this SOP should be sent to the OPR for review.

    3. DISTRIBUTION.
    This SOP is intended for use by controllers staffing Point Mugu Approach (NTD_APP)

    4. BACKGROUND.
    This SOP will be the primary outline of Point Mugu Approach procedures

    5. REQUIREMENTS.
    1. Frequencies
      1. Point Mugu Approach 124.70
      2. Point Mugu Tower 124.85
      3. Point Mugu Ground 121.60
      4. Point Mugu Clearance Delivery 120.75
      5. All other positions within the Point Mugu RAPCON will use frequencies prescribed in the Minor Airport Reference Sheet.
    2. Airspace
      1. Point Mugu Approach owns the airspace as depicted on the video map from SFC-8000, excluding the area known as Plead Control unless otherwise coordinated. 
    3. Special Instructions
      1. KCMA/KOXR Arrivals will be received from the SOCAL Burbank Area established on the final approach course and cleared for the approach. These aircraft must be monitored and handled if they go missed