ZLA Logo
Who's Online
Online Controllers

No controllers online

Flights to/from ZLA

Departures (8)

Callsign Dep Arr Status ETA
QFA12 KLAX YSSY Enroute 1552
DAL87 KLAX VHHH Enroute 2150
DAL24 KLAX VHHH Enroute 2209
DAL1787 KLAX KLGA Enroute 1215
UNI3085 KLAX YSSY Enroute 0054
BAW93J KLAX EGKK Arriving
CES0729 KLAX ZSPD Enroute 0022
UKV3140 KLAX KSJC Enroute 1600

Arrivals (9)

Callsign Dep Arr Status ETA
UAE83M OMDB KLAX Enroute 0030
SXB8607 SBGR KLAX Enroute 0316
AAL72 YSSY KLAX Enroute 1832
DLH452 EDDM KLAX Enroute 0141
DAL909 UHPP KLAX Enroute 2215
UAL1636 PHNL KLAX Enroute 2013
JBU1001 KFLL KLAX Enroute 2103
KLM601 EHAM KLAX Departing
SWA1100 KBWI KLAX Enroute 2341

Los Angeles (SoCal) 17

Departures (2)

Callsign Dep Arr Status ETA
DAL492 KSAN LTFM Enroute 1556
AAL575 KSAN KATL Enroute 1423

Arrivals (2)

Callsign Dep Arr Status ETA
BAW273 EGLL KSAN Enroute 0429
AAL8215 MKJS KSAN Enroute 2058

San Diego (SoCal) 4

Departures (1)

Callsign Dep Arr Status ETA
SWA1450 KLGB KSLC Enroute 0234

Coast (SoCal) 1

Departures (7)

Callsign Dep Arr Status ETA
QFA56 KLAS YSSY Enroute 2256
STI55K KLAS KMIA Enroute 1252
AEE292 KLAS KDEN Enroute 1600
SWA3315 KLAS KABQ Enroute 1043
FFT3016 KLAS KSLC Enroute 1600
DAL1893 KLAS KSLC Enroute 1600
SWA279 KLAS KSJC Enroute 1600

Las Vegas 7
  • Flights To/From ZLA: 29
  • Flights in ZLA Airspace: 8
  • Controller Schedule

    November 2nd, 2026

    No sessions found for selected date

    Point Mugu Approach (NTD)

    DATE VERSION CONTACT
    2025-05-13 3.20 Facility Advisory Board
    1. PURPOSE.
    This Standard Operating Procedure (SOP) outlines the procedures to be used by controllers working Point Mugu Approach to ensure that arrival flows are handled in as efficient and timely a manner as possible.

    2. ROLES AND RESPONSIBILITIES.
    The Office of Primary Responsibility (OPR) for this SOP is the ZLA Senior Staff. This SOP was approved by the Staff on January 1, 2003. This SOP shall be maintained, revised, updated or canceled by the ZLA Senior Staff and Facility Engineering Team. Any suggestions for modification or amendment to this SOP should be sent to the OPR for review.

    3. DISTRIBUTION.
    This SOP is intended for use by controllers staffing Point Mugu Approach (NTD_APP)

    4. BACKGROUND.
    This SOP will be the primary outline of Point Mugu Approach procedures

    5. REQUIREMENTS.
    1. Frequencies
      1. Point Mugu Approach 124.70
      2. Point Mugu Tower 124.85
      3. Point Mugu Ground 121.60
      4. Point Mugu Clearance Delivery 120.75
      5. All other positions within the Point Mugu RAPCON will use frequencies prescribed in the Minor Airport Reference Sheet.
    2. Airspace
      1. Point Mugu Approach owns the airspace as depicted on the video map from SFC-8000, excluding the area known as Plead Control unless otherwise coordinated. 
    3. Special Instructions
      1. KCMA/KOXR Arrivals will be received from the SOCAL Burbank Area established on the final approach course and cleared for the approach. These aircraft must be monitored and handled if they go missed