ZLA Logo
Who's Online
Online Controllers

No controllers online

Flights to/from ZLA

Departures (13)

Callsign Dep Arr Status ETA
SAS932 KLAX EKCH Enroute 1020
VIR142 KLAX EGLL Enroute 1049
KAL274 KLAX RKSI Enroute 1342
SAS363 KLAX ESSA Enroute 1129
AAL83 KLAX NZAA Enroute 1607
ANZ95 KLAX NZAA Enroute 1611
UAL923 KLAX EGLL Enroute 1701
BOX383 KLAX EDDP Enroute 1815
BAW8DS KLAX EGLL Enroute 0931
DLH277 KLAX EDDF Enroute 1601
AAL2453 KLAX KBOS Arriving
UAL1269 KLAX KCLT Enroute 1258
CFG081 KLAX EDDF Enroute 0936

Arrivals (10)

Callsign Dep Arr Status ETA
THY9 LTFM KLAX Enroute 1757
TWS8MT LTFM KLAX Enroute 2036
THT8 NTAA KLAX Enroute 1711
TWS9 LTFM KLAX Enroute 2017
CES583 ZSPD KLAX Enroute 2137
AAL72 YSSY KLAX Enroute 1446
LSP602 SCEL KLAX Enroute 1403
AFR22J LFPG KLAX Enroute 0217
GTI8675 KMIA KLAX Enroute 1736
SIA7443 KCVG KLAX Departing

Los Angeles (SoCal) 23

Arrivals (1)

Callsign Dep Arr Status ETA
SJX10 RCTP KONT Enroute 1949

Empire (SoCal) 1

Departures (3)

Callsign Dep Arr Status ETA
SIA711 KSAN EGLL Enroute 1343
SWA3904 KSAN KMCO Enroute 0923
JAL140 KSAN RJAA Enroute 1635

Arrivals (2)

Callsign Dep Arr Status ETA
BAW273 EGLL KSAN Enroute 1928
SSR182 LFPG KSAN Enroute 2058

San Diego (SoCal) 5
  • Flights To/From ZLA: 29
  • Flights in ZLA Airspace: 2
  • Controller Schedule

    August 20th, 2026

    Los Angeles Tower
    Gil Tzoore

    OTS with AK

    1600 - 1730 PDT / 2300 - 0030 Zulu

    Los Angeles Tower
    Noah Karpf

    Session with CH

    2000 - 2130 PDT / 0300 - 0430 Zulu

    Point Mugu Approach (NTD)

    DATE VERSION CONTACT
    2025-05-13 3.20 Facility Advisory Board
    1. PURPOSE.
    This Standard Operating Procedure (SOP) outlines the procedures to be used by controllers working Point Mugu Approach to ensure that arrival flows are handled in as efficient and timely a manner as possible.

    2. ROLES AND RESPONSIBILITIES.
    The Office of Primary Responsibility (OPR) for this SOP is the ZLA Senior Staff. This SOP was approved by the Staff on January 1, 2003. This SOP shall be maintained, revised, updated or canceled by the ZLA Senior Staff and Facility Engineering Team. Any suggestions for modification or amendment to this SOP should be sent to the OPR for review.

    3. DISTRIBUTION.
    This SOP is intended for use by controllers staffing Point Mugu Approach (NTD_APP)

    4. BACKGROUND.
    This SOP will be the primary outline of Point Mugu Approach procedures

    5. REQUIREMENTS.
    1. Frequencies
      1. Point Mugu Approach 124.70
      2. Point Mugu Tower 124.85
      3. Point Mugu Ground 121.60
      4. Point Mugu Clearance Delivery 120.75
      5. All other positions within the Point Mugu RAPCON will use frequencies prescribed in the Minor Airport Reference Sheet.
    2. Airspace
      1. Point Mugu Approach owns the airspace as depicted on the video map from SFC-8000, excluding the area known as Plead Control unless otherwise coordinated. 
    3. Special Instructions
      1. KCMA/KOXR Arrivals will be received from the SOCAL Burbank Area established on the final approach course and cleared for the approach. These aircraft must be monitored and handled if they go missed