ZLA Logo
Who's Online
Online Controllers

No controllers online

Flights to/from ZLA

Departures (9)

Callsign Dep Arr Status ETA
QFA2213 KLAX YSSY Enroute 0927
QTR1E KLAX OTHH Enroute 1403
FJI811 KLAX NFFN Enroute 0937
BAW8DS KLAX EGLL Enroute 0912
FIN2 KLAX EFHK Enroute 1251
AAL136 KLAX LEMD Enroute 1620
DLH453 KLAX EDDM Enroute 0930
UAL1221 KLAX KSFO Enroute 1813
UAL1068 KLAX KSAN Enroute 1823

Arrivals (6)

Callsign Dep Arr Status ETA
AFR103 YSSY KLAX Enroute 0524
FDX88T KMIA KLAX Enroute 1731
EMNYX OTHH KLAX Enroute 1853
AAL501 KORD KLAX Enroute 1728
DLH452 EDDM KLAX Departing
NKS7657 CYYZ KLAX Enroute 2210

Los Angeles (SoCal) 15

Arrivals (1)

Callsign Dep Arr Status ETA
FDX606 LFPG KONT Enroute 2339

Empire (SoCal) 1

Arrivals (2)

Callsign Dep Arr Status ETA
UAL1068 KLAX KSAN Enroute 1823
SSR772 KTEB KSAN Enroute 1659

San Diego (SoCal) 2

Arrivals (1)

Callsign Dep Arr Status ETA
SWA1147 KSLC KLGB Enroute 1825

Coast (SoCal) 1

Arrivals (1)

Callsign Dep Arr Status ETA
DAL3133 KBOI KBUR Enroute 1507

Burbank (SoCal) 1

Departures (2)

Callsign Dep Arr Status ETA
SWA4438 KLAS KMKE Arriving
GEC81I KLAS KSFO Enroute 1757

Arrivals (2)

Callsign Dep Arr Status ETA
SWA3123 KDEN KLAS Enroute 0731
DAL112 KSFO KLAS Enroute 1600

Las Vegas 4
  • Flights To/From ZLA: 24
  • Flights in ZLA Airspace: 7
  • Controller Schedule

    November 16th, 2026

    Lindbergh Tower
    Ryan Stalets

    Session with JD

    1600 - 1730 PST / 0000 - 0130 Zulu

    Point Mugu Approach (NTD)

    DATE VERSION CONTACT
    2025-05-13 3.20 Facility Advisory Board
    1. PURPOSE.
    This Standard Operating Procedure (SOP) outlines the procedures to be used by controllers working Point Mugu Approach to ensure that arrival flows are handled in as efficient and timely a manner as possible.

    2. ROLES AND RESPONSIBILITIES.
    The Office of Primary Responsibility (OPR) for this SOP is the ZLA Senior Staff. This SOP was approved by the Staff on January 1, 2003. This SOP shall be maintained, revised, updated or canceled by the ZLA Senior Staff and Facility Engineering Team. Any suggestions for modification or amendment to this SOP should be sent to the OPR for review.

    3. DISTRIBUTION.
    This SOP is intended for use by controllers staffing Point Mugu Approach (NTD_APP)

    4. BACKGROUND.
    This SOP will be the primary outline of Point Mugu Approach procedures

    5. REQUIREMENTS.
    1. Frequencies
      1. Point Mugu Approach 124.70
      2. Point Mugu Tower 124.85
      3. Point Mugu Ground 121.60
      4. Point Mugu Clearance Delivery 120.75
      5. All other positions within the Point Mugu RAPCON will use frequencies prescribed in the Minor Airport Reference Sheet.
    2. Airspace
      1. Point Mugu Approach owns the airspace as depicted on the video map from SFC-8000, excluding the area known as Plead Control unless otherwise coordinated. 
    3. Special Instructions
      1. KCMA/KOXR Arrivals will be received from the SOCAL Burbank Area established on the final approach course and cleared for the approach. These aircraft must be monitored and handled if they go missed