ZLA Logo
Who's Online
Online Controllers

No controllers online

Flights to/from ZLA

Departures (11)

Callsign Dep Arr Status ETA
PAL103 KLAX RPLL Enroute 1359
BAW28F KLAX EGLL Enroute 1216
AAL3010 KLAX RJTT Enroute 1328
N233CL KLAX PHNL Enroute 1552
AAL73 KLAX YSSY Enroute 1605
QTR740 KLAX OTHH Enroute 0245
DLH453 KLAX EDDM Enroute 1730
SIA39 KLAX WSSS Enroute 2301
UAE37V KLAX OMDB Enroute 1150
SAS88B KLAX CYVR Enroute 2114
DAL547 KLAX KMCO Enroute 1022

Arrivals (6)

Callsign Dep Arr Status ETA
PAC962 RJAA KLAX Enroute 2030
DAL1008 KSLC KLAX Enroute 2033
CPA880 VHHH KLAX Enroute 0745
DLH452 EDDM KLAX Enroute 0437
AUA98 LOWW KLAX Departing
DLH254 EDDM KLAX Departing

Los Angeles (SoCal) 17

Arrivals (1)

Callsign Dep Arr Status ETA
SWA91 KLAS KSNA Enroute 1956

Coast (SoCal) 1

Departures (1)

Callsign Dep Arr Status ETA
SWA91 KLAS KSNA Enroute 1956

Arrivals (2)

Callsign Dep Arr Status ETA
PRNCO MPTO KLAS Enroute 1930
UAL686 KIAH KLAS Departing

Las Vegas 3
  • Flights To/From ZLA: 21
  • Flights in ZLA Airspace: 2
  • Controller Schedule

    November 21st, 2024

    Los Angeles Tower
    Jay Smith

    Session with RK

    1700 - 1830 PST / 0100 - 0230 Zulu

    Point Mugu Approach (NTD)

    DATE VERSION CONTACT
    2024-06-20 3.10 Facility Advisory Board
    1. PURPOSE.
    This Standard Operating Procedure (SOP) outlines the procedures to be used by controllers working Point Mugu Approach to ensure that arrival flows are handled in as efficient and timely a manner as possible.

    2. ROLES AND RESPONSIBILITIES.
    The Office of Primary Responsibility (OPR) for this SOP is the ZLA Senior Staff. This SOP was approved by the FAB on January 01, 2003. This SOP shall be maintained, revised, updated or canceled by the ZLA Senior Staff and Facility Engineering Team. Any suggestions for modification or amendment to this SOP should be sent to the OPR for review.

    3. DISTRIBUTION.
    This SOP is intended for use by controllers staffing Point Mugu Approach (NTD_APP)

    4. BACKGROUND.
    This SOP will be the primary outline of Point Mugu Approach procedures

    5. REQUIREMENTS.
    1. Frequencies
      1. Point Mugu Approach 124.70
      2. Point Mugu Tower 124.85
      3. Point Mugu Ground 121.60
      4. Point Mugu Clearance Delivery 120.75
      5. San Clemente Tower 126.75
      6. San Clemente Ground 119.55
      7. San Nicholas Tower 126.85
      8. All other positions within the Point Mugu RAPCON will use frequencies prescribed in the Minor Airport Reference Sheet.
    2. Airspace
      1. Point Mugu Approach owns the airspace as shown on the RAPCON graphic from SFC-8000’
    3. Special Instructions
      1. KCMA/KOXR Arrivals will be received from the SOCAL Burbank Area established on the final approach course and cleared for the approach. These aircraft must be monitored and handled if they go missed