ZLA Logo
Who's Online
Online Controllers Flights to/from ZLA

Departures (9)

Callsign Dep Arr Status ETA
JBU700 KLAX KFLL Enroute 0935
DAL407 KLAX KDTW Enroute 1008
FIN009 KLAX EFHK Enroute 1613
GEC1881 KLAX EDDM Enroute 0820
DAL631 KLAX MMMX Enroute 1013
VJT651 KLAX EGLF Arriving
SWR41G KLAX LSZH Enroute 0827
DAL2120 KLAX KLAS Enroute 1035
DHK051 KLAX EGNX Arriving

Arrivals (6)

Callsign Dep Arr Status ETA
DAL40 YSSY KLAX Enroute 1439
DAL88 VHHH KLAX Enroute 1852
DLH456 EDDF KLAX Departing
UAE83M OMDB KLAX Enroute 0310
DLH452 EDDM KLAX Departing
NJE4VP EINN KLAX Departing

Los Angeles (SoCal) 15

Arrivals (1)

Callsign Dep Arr Status ETA
DAL504 KSLC KSAN Enroute 2129

San Diego (SoCal) 1

Departures (2)

Callsign Dep Arr Status ETA
T99XC KSNA KOAK Enroute 0124
SWA43X KSNA KSFO Enroute 1909

Coast (SoCal) 2

Departures (3)

Callsign Dep Arr Status ETA
EJA165 KBUR KSFO Enroute 0726
UAL2854 KBUR KSFO Enroute 1911
9HANS KBUR KSFO Enroute 0553

Arrivals (4)

Callsign Dep Arr Status ETA
VJT1506 LFPB KVNY Enroute 2125
WWI21 KTEB KVNY Enroute 1758
SWA1997 PHNL KBUR Enroute 1623
EJA169 KAPF KVNY Enroute 1915

Burbank (SoCal) 7

Departures (3)

Callsign Dep Arr Status ETA
QTR8104 KLAS OTHH Enroute 1255
BAW9117 KLAS OTHH Enroute 2046
SWA4990 KLAS KMDW Enroute 1600

Arrivals (1)

Callsign Dep Arr Status ETA
DAL2120 KLAX KLAS Enroute 1035

Las Vegas 4
  • Flights To/From ZLA: 29
  • Flights in ZLA Airspace: 7
  • Controller Schedule

    November 25th, 2026

    No sessions found for selected date

    Point Mugu Approach (NTD)

    DATE VERSION CONTACT
    2025-05-13 3.20 Facility Advisory Board
    1. PURPOSE.
    This Standard Operating Procedure (SOP) outlines the procedures to be used by controllers working Point Mugu Approach to ensure that arrival flows are handled in as efficient and timely a manner as possible.

    2. ROLES AND RESPONSIBILITIES.
    The Office of Primary Responsibility (OPR) for this SOP is the ZLA Senior Staff. This SOP was approved by the Staff on January 1, 2003. This SOP shall be maintained, revised, updated or canceled by the ZLA Senior Staff and Facility Engineering Team. Any suggestions for modification or amendment to this SOP should be sent to the OPR for review.

    3. DISTRIBUTION.
    This SOP is intended for use by controllers staffing Point Mugu Approach (NTD_APP)

    4. BACKGROUND.
    This SOP will be the primary outline of Point Mugu Approach procedures

    5. REQUIREMENTS.
    1. Frequencies
      1. Point Mugu Approach 124.70
      2. Point Mugu Tower 124.85
      3. Point Mugu Ground 121.60
      4. Point Mugu Clearance Delivery 120.75
      5. All other positions within the Point Mugu RAPCON will use frequencies prescribed in the Minor Airport Reference Sheet.
    2. Airspace
      1. Point Mugu Approach owns the airspace as depicted on the video map from SFC-8000, excluding the area known as Plead Control unless otherwise coordinated. 
    3. Special Instructions
      1. KCMA/KOXR Arrivals will be received from the SOCAL Burbank Area established on the final approach course and cleared for the approach. These aircraft must be monitored and handled if they go missed