ZLA Logo
Who's Online
Online Controllers

No controllers online

Flights to/from ZLA

Departures (16)

Callsign Dep Arr Status ETA
CPA883 KLAX VHHH Enroute 0729
EIN9MY KLAX EIDW Enroute 0643
UAL89 KLAX RJTT Enroute 1335
AAL3TB KLAX EGLL Enroute 0940
FDX5810 KLAX EGLL Enroute 0948
DAL1 KLAX LOWW Enroute 1403
AAL136 KLAX EGLL Enroute 1425
AAL2453 KLAX KBOS Enroute 0958
VIR168 KLAX PHNL Enroute 2209
DLH451 KLAX EDDF Enroute 0746
ETH71 KLAX LIRF Enroute 1557
AAL938 KLAX KCLT Enroute 0910
SIA37 KLAX WSSS Enroute 1642
DAL22 KLAX KDEN Enroute 1829
ITA460 KLAX LIRF Enroute 0007
DAL2457 KLAX KPDX Enroute 1600

Arrivals (7)

Callsign Dep Arr Status ETA
DAL18 VHHH KLAX Enroute 1846
JBU101 KGEG KLAX Enroute 0309
SWA552 KBNA KLAX Enroute 1544
QFA17 YSSY KLAX Enroute 1357
AAL2869 KPHX KLAX Enroute 1600
FDX1299 NZAA KLAX Enroute 1148
DAL220 KSEA KLAX Enroute 2347

Los Angeles (SoCal) 23

Departures (1)

Callsign Dep Arr Status ETA
HAZ6502 KONT RCSS Enroute 0552

Empire (SoCal) 1

Arrivals (1)

Callsign Dep Arr Status ETA
SWA192 KDAL KSAN Enroute 1521

San Diego (SoCal) 1

Departures (1)

Callsign Dep Arr Status ETA
AAL152 KLAS KOAK Enroute 1600

Arrivals (1)

Callsign Dep Arr Status ETA
KAL005 RKSI KLAS Enroute 1742

Las Vegas 2

Departures (1)

Callsign Dep Arr Status ETA
WAT2476 KSGU KSLC Enroute 0350

Other 1
  • Flights To/From ZLA: 28
  • Flights in ZLA Airspace: 11
  • Controller Schedule

    June 18th, 2026

    Lindbergh Tower
    Levi Sherman

    Session with CH

    1730 - 1900 PDT / 0030 - 0200 Zulu

    Point Mugu Approach (NTD)

    DATE VERSION CONTACT
    2025-05-13 3.20 Facility Advisory Board
    1. PURPOSE.
    This Standard Operating Procedure (SOP) outlines the procedures to be used by controllers working Point Mugu Approach to ensure that arrival flows are handled in as efficient and timely a manner as possible.

    2. ROLES AND RESPONSIBILITIES.
    The Office of Primary Responsibility (OPR) for this SOP is the ZLA Senior Staff. This SOP was approved by the Staff on January 1, 2003. This SOP shall be maintained, revised, updated or canceled by the ZLA Senior Staff and Facility Engineering Team. Any suggestions for modification or amendment to this SOP should be sent to the OPR for review.

    3. DISTRIBUTION.
    This SOP is intended for use by controllers staffing Point Mugu Approach (NTD_APP)

    4. BACKGROUND.
    This SOP will be the primary outline of Point Mugu Approach procedures

    5. REQUIREMENTS.
    1. Frequencies
      1. Point Mugu Approach 124.70
      2. Point Mugu Tower 124.85
      3. Point Mugu Ground 121.60
      4. Point Mugu Clearance Delivery 120.75
      5. All other positions within the Point Mugu RAPCON will use frequencies prescribed in the Minor Airport Reference Sheet.
    2. Airspace
      1. Point Mugu Approach owns the airspace as depicted on the video map from SFC-8000, excluding the area known as Plead Control unless otherwise coordinated. 
    3. Special Instructions
      1. KCMA/KOXR Arrivals will be received from the SOCAL Burbank Area established on the final approach course and cleared for the approach. These aircraft must be monitored and handled if they go missed