1. PURPOSE.
This Standard Operating Procedure (SOP) outlines the procedures to be used by controllers working Point Mugu Approach to ensure that arrival flows are handled in as efficient and timely a manner as possible.
2. ROLES AND RESPONSIBILITIES.
The Office of Primary Responsibility (OPR) for this SOP is the ZLA Facility Advisory Board (FAB). This SOP was approved by the FAB on January 01, 2003. This SOP shall be maintained, revised, updated or canceled by the ZLA FAB or any other organization that supersedes, replaces or assumes the FAB responsibilities. Any suggestions for modification or amendment to this SOP should be sent to the ZLA FAB for review.
3. DISTRIBUTION.
This SOP is intended for use by controllers staffing Point Mugu Approach (NTD_APP)
4. BACKGROUND.
This SOP will be the primary outline of Point Mugu Approach procedures
5. REQUIREMENTS.
- Frequencies
- NTD_APP 124.70
- NTD_TWR 124.85
- NTD_GND 121.60
- NTD_DEL 120.75
- NUC_TWR 126.75
- NUC_GND 119.55
- NSI_TWR 126.85
- All other positions within NTD_APP will use frequencies prescribed in the Minor Airport Reference Sheet.
- Airspace
- NTD_APP owns the airspace as shown on the TRACON graphic from SFC-8000’
- Special Instructions
- KCMA/KOXR Arrivals will be received from BUR_APP established on the final approach course and cleared for the approach. These aircraft must be monitored and handled if they go missed