ZLA Logo
Who's Online
Online Controllers

No controllers online

Flights to/from ZLA

Departures (8)

Callsign Dep Arr Status ETA
AMX785 KLAX MMGL Enroute 1550
UAL1170 KLAX PHNL Enroute 1622
UAE218 KLAX OMDB Enroute 1343
JBU488 KLAX KBOS Enroute 1239
VIR24M KLAX EGLL Enroute 1701
VIR8Y KLAX EGLL Enroute 0945
DLH311 KLAX EDDF Enroute 2237
CES586 KLAX ZSPD Enroute 2029

Arrivals (12)

Callsign Dep Arr Status ETA
KAL017 RKSI KLAX Enroute 1844
UPS5255 KSDF KLAX Enroute 2011
DAL427 PHNL KLAX Enroute 1819
SWA3982 PHNL KLAX Enroute 1822
AAL2228 KPHX KLAX Enroute 2012
UAL38 RJTT KLAX Enroute 2130
ANA6 RJAA KLAX Enroute 0244
SIA38 WSSS KLAX Departing
DHK51 ZSPD KLAX Departing
DLH457 EDDF KLAX Enroute 0143
AFR6205 LFMN KLAX Departing
KAL883 RKSI KLAX Enroute 1734

Los Angeles (SoCal) 20

Departures (1)

Callsign Dep Arr Status ETA
FFT4690 KONT KDFW Arriving

Arrivals (1)

Callsign Dep Arr Status ETA
UAL1656 KDEN KONT Enroute 2230

Empire (SoCal) 2

Departures (2)

Callsign Dep Arr Status ETA
UAL1337 KSAN KDEN Enroute 1600
FFT1572 KSAN KPHX Enroute 1029

Arrivals (1)

Callsign Dep Arr Status ETA
DAL4RC KBOI KSAN Enroute 1831

San Diego (SoCal) 3

Departures (1)

Callsign Dep Arr Status ETA
ASA817 KLAS PHNL Enroute 1843

Arrivals (1)

Callsign Dep Arr Status ETA
DAL210 CYVR KLAS Enroute 1933

Las Vegas 2

Departures (1)

Callsign Dep Arr Status ETA
SWA1932 KSBA KOAK Enroute 1049

Santa Barbara 1
  • Flights To/From ZLA: 28
  • Flights in ZLA Airspace: 6
  • Controller Schedule

    June 2nd, 2026

    No sessions found for selected date

    Point Mugu Approach (NTD)

    DATE VERSION CONTACT
    2025-05-13 3.20 Facility Advisory Board
    1. PURPOSE.
    This Standard Operating Procedure (SOP) outlines the procedures to be used by controllers working Point Mugu Approach to ensure that arrival flows are handled in as efficient and timely a manner as possible.

    2. ROLES AND RESPONSIBILITIES.
    The Office of Primary Responsibility (OPR) for this SOP is the ZLA Senior Staff. This SOP was approved by the Staff on January 1, 2003. This SOP shall be maintained, revised, updated or canceled by the ZLA Senior Staff and Facility Engineering Team. Any suggestions for modification or amendment to this SOP should be sent to the OPR for review.

    3. DISTRIBUTION.
    This SOP is intended for use by controllers staffing Point Mugu Approach (NTD_APP)

    4. BACKGROUND.
    This SOP will be the primary outline of Point Mugu Approach procedures

    5. REQUIREMENTS.
    1. Frequencies
      1. Point Mugu Approach 124.70
      2. Point Mugu Tower 124.85
      3. Point Mugu Ground 121.60
      4. Point Mugu Clearance Delivery 120.75
      5. All other positions within the Point Mugu RAPCON will use frequencies prescribed in the Minor Airport Reference Sheet.
    2. Airspace
      1. Point Mugu Approach owns the airspace as depicted on the video map from SFC-8000, excluding the area known as Plead Control unless otherwise coordinated. 
    3. Special Instructions
      1. KCMA/KOXR Arrivals will be received from the SOCAL Burbank Area established on the final approach course and cleared for the approach. These aircraft must be monitored and handled if they go missed